Pictures from Nora bergslags vetaranjärnäg

To Page 2




E2 1046 with a steel carriage train bounding for Järle
July 27:th 2002


Winter

Track maintance work

Movies




SWB H3 no 56 arrives to Järle. The engine is build at the SWB workshop in Västerås 1931.
August 11:th 2002


TGOJ Y3 125 with a charter train in Pershyttan and Gyttorp
October 7:th 2001


Railcars in Nora. Y7 1242, UBFo7ye 2087 and Y8 1125 in front of the station (left). Y8 1125 with a train to Gyttorp. In the background is TGOJ Y3a 125 waiting for departure to Järle (right).
August 16:th and June 29:th 2002


Tony Billström and Henrik Klockerman prepares Y7 1242 for the next day (left). Henric in the drivers seat (middle).


NBJ T23 at Stora Mon
August 24 2002

NBJ T23 on the turntable in Nora
August 17:th 2002

Some railcars stops in Järle
August 24 2002

Y8 1125 at MellanMon
August 11:th 2002

Y7 1242 with UBFo7ye 2087 in Gyttorp
August 25 2002

Sb 1306, E2 1046 and H3 56 at the turntable
August 24 2002

TGOJ Y3a 125 departs with a special train to Järle
June 29 2002


To Page 2

Back